PERI

Kurumsal
Hakkımızda
 
Ürünler
Türkiye'den Referans Projeler
Referanslar
 
Bize Ulaşın
Bölge Müdürlükleri
 
Fuar ve Haberler
Haberler
bauma 2007
PERI Aktüel
Sitemap
Arama

PERI global
Homepage > International Projects >

Scaffold units



StadtQuartier Riem Arcaden, Munich
On the large construction site of RiemArcaden in Munich, the Weissenhorner formwork and scaffold manufacturer PERI, provided a universal scaffolding concept for the skeleton structure on the basis of the PERI UP systems. This provided the site not only with a high standard of safety for the formwork and concreting, but a solution for the whole manufacture of the concrete components. (Photo: PERI GmbH) The Riem Arcaden construction site is one of the largest construction projects in the Munich area at present.


PERI UP crane handled reinforcement scaffold
PERI UP crane handled reinforcement scaffold The site receives a scaffold, free of ballast and anchors, which can be moved and repositioned without modification.


  Turkish    


PERI
Kalıp El kitabı

 PERI Elkitabı Kalıp
 

İnternet üzerinden sipariş