Homepage > International Projects >

Administration Buildings

Page:  1 


University of Wisconsin Children's Hospital, Madison, Wisconsin
University of Wisconsin Children's Hospital, Madison, Wisconsin The three 142 ft (43.30 m) cores of the structure were formed using TRIO, KGF 240 scaffold brackets and BR internal shaft platforms.


Mercedes Benz HTC, Brooklands, Weybridge, Surrey
Mercedes Benz HTC, Brooklands, Weybridge, Surrey Achieved through high-tech insitu casting, these elements - designed to copy the stylish slants and angles of its historic racing machines - now combine to create a geometry that is as striking to behold as it was challenging to build.


City of Edinburgh Council Offices, Edinburgh
From level one and above 6m x 3m MULTIPROP tables were used with 3m x 1.5m 21mm combi mirror fairfaced plywood to give the required finish to soffit and to line up with curved fibreglass moulds to the vaulted ceiling. Additional MULTIPROP beam tables provide support for the fibreglass moulds. The new City of Edinburgh Council Offices are being constructed by PJ Carey (Contractors) Ltd for Miller Construction Ltd using a range of PERI formwork & falsework systems.


Office and Business Complex, Lübeckertordamm, Hamburg
The Lübeckertordamm office complex consists of two boomerang-shaped structural wings. Stuttgart-based contractors, Müller-Altvatter, developed a comprehensive formwork concept together with the formwork and scaffolding specialists, PERI. (Photo: PERI GmbH) For the office complex, consisting of two boomerang-shaped structural wings, Stuttgart-based contractors, Müller-Altvatter, developed a comprehensive formwork concept together with PERI.


Royal Ottawa Hospital, Ottawa, Ontario
SKYDECK panels were used on the top of these high MULTIPROP towers. Panels were safely placed from above. The PERI modular SKYDECK slab formwork system was chosen for this project as the proven aluminum MULTIPROP was the ideal solution to form these high floors.