Achieved through high-tech insitu casting, these elements - designed to copy the stylish slants and angles of its historic racing machines - now combine to create a geometry that is as striking to behold as it was challenging to build.
The new City of Edinburgh Council Offices are being constructed by PJ Carey (Contractors) Ltd for Miller Construction Ltd using a range of PERI formwork & falsework systems.
For the office complex, consisting of two boomerang-shaped structural wings, Stuttgart-based contractors, Müller-Altvatter, developed a comprehensive formwork concept together with PERI.
The PERI modular SKYDECK slab formwork system was chosen for this project as the proven aluminum MULTIPROP was the ideal solution to form these high floors.