Siekierkowska Road Junction, Warsaw, Poland
|
|
To ensure fast building progress, six casting segments around 50 m long in each case were to be formed at the same time. For forming the box-type cross-sections of the reinforced concrete bridges, PERI engineers designed raised formwork units ...
|
|
|
|
|
 |
Kingston Bridge, Glasgow
|
|
With 100 units on site, the parapet work constituted over 75% of the PERI contract, but it was shuttering for a column that had to be totally replaced that made this particular job different.
|
|
|
|
|
 |
A421 Great Barford Bypass, Roxton, Bedfordshire
|
|
As it was impossible to achieve the required level of concrete finish for the 12 bridge piers using steel-faced shutters and traditionally fabricated formwork panels, the Contractor chose special pre-fabricated formwork systems manufactured ...
|
|
|
|
|
|

|
|