The Weissenhorn-based formwork and scaffolding specialist, PERI, provided a comprehensive concept for cost-effective erection of the massive reinforced concrete walls and slabs required for this very unusual construction site.
The ever rising demand as a result of population and economic growth led Neckarwerke AG to extend the Altbach-Plochingen combined heating and power station.
To use wind power is seen as an ecologically sensible way of extracting energy. An off-shore plant was constructed for this purpose in the sea, two kilometres away from Copenhagen harbour.