 |


|
|
|
|
|
Homepage >
International Projects >
|
|

Sewage Works
|
|
Page:
1
2
3
|
|

|
 |
Wastewater Treatment Plant, As Samra, Jordan
|
|
For around sixty individual structures, formwork and scaffolding specialist, PERI, provided the most economical solutions. Among other things, eight circular aeration tanks as well as eight final settling basins, with diameters of 65 and 54 ...
|
|
|
|
|
 |
Dinnington Sewage Treatment Works, Nottinghamshire
|
|
Reinforced Structures Proprietor, Dave Johnson, chose to have the RUNDFLEX circular wall formwork for the 19m diameter Final Settlement Tanks pre-fabricated by skilled craftsmen at the PERI fabrication workshop in Rugby.
|
|
|
|
|
|

|
|